Home  

CSCI 476 Software Engineering II

 
  Syllabus  
Samples Templates Rubrics
   

Status Report Dates: Jan 24, Feb 21, Mar 13 (Listed as Friday for your convenience. Submit on Thursday when feasible.)

 Topics Reading Due Dates
Jan 14-16 Introduction, Requirments Triage, Project, The Art of Requirements Triage (see Blackboard) RTM, Design - Jan 17
Jan 21-23Writing the ProgramsCh 7, Schedule Entry Ticket, Detailed schedule, Status Report- Jan 24 (noon)
Jan 28- 30 Testing the Programs Ch 8.1-8.2 Entry Ticket
Feb 4- 6 Testing 8.3 Entry Ticket
Feb 11-13Testing 8.4-end Entry Ticket
Feb 18 - 20 Mid-Term   Mid-Term - Feb 18
Feb 25- 27 Testing the System Ch 9.1-9.3 Entry Ticket 
Mar 3-5 Testing the System 9.4-9.8 Entry Ticket
Mar 10-12 Testing the System9.9, 6.6 (348-351), 6.7 Entry Ticket Status Report Mar 13
Mar 17-19Spring Break   
Mar 24-26Testing the System 9.9, 6.6 (348-351), 6.7 Entry Ticket 
Mar 31-Apr 2 Review of installed software.  By appointment.  During class time    Demonstrate SW. By Appointment.
Apr 7-9 Delivering and Maintaining the System Ch 10 Entry Ticket
Apr14-16 Presentations   Presentations/Demonstrations
Apr21-23 Delivering and Maintaining the System, Wrap-up Ch 11 Notes  Final Software, Documentation, Production Site - Apr 21
Proj Log, Peer Eval - Apr 23
May 1Cumulative Final Exam  Friday 11:30 AM       (Verify with Exam Sch)